MTD 19A30031OEM Manual Del Operador página 9

Ocultar thumbs Ver también para 19A30031OEM:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Installing the Upper Chute Tube
1.
Thread the upper end of the chute tube
securely into the upper chute support. There
are two tabs on the lower inside part of the
upper chute support to allow for secure
threading. See Figure 4-23.
NOTE: The chute tube and upper chute
support are left-hand threaded. Thread
counterclockwise until secure.
Figure 1-23
2.
Lift by the handles at the bottom of the chute
tube. Slide the chute tube over the chute
elbow mounted on the cutting deck, as shown
in Figure 4-24.
2
1
Figure 1-24
3.
Make sure the connection is secure and there
are no gaps between the chute tube and the
chute elbow.
4.
If open, close the grass catcher cover prior to
mowing.
S
4 — A
& i
ection
SSembly
nStAllAtion
9
Tabla de contenido
loading

Tabla de contenido