WIRING INSTRUCTIONS- two of two
STEP 7: Install forward/reverse shuttle and on-off switch into left housing
halve-support. Be sure shuttle is properly seated over the forward/reverse
tab on top of on-off switch.
STEP 9: Use a plastic/nylon instrument to carefully press blue wire into
housing cavity, over the battery terminal wires.
STEP 10: Install battery terminal block into the housing halve being sure
that it is firmly and squarely seated in the cavity.
STEP 8: Route the PCBA wires connected with battery terminal into the
wire channel of left housing as shown.
STEP 11: Assemble the gear case assembly onto the left housing halve
and secure with two gear case screws.
Check that all elements of electronics assembly are seated properly and
that all wires are pressed completely down in wire traps and channels.
Carefully install right housing halve-cover onto left housing halve-support.
Secure with five housing halve screws and the two remaining gear case
screws. Install rotor back cap assembly and secure with four screws.
Check functionality of shuttle and on-off switch before installing battery.