9.4. SVT – Step Voltage Test
In this mode of operation, the user does not set a specific test voltage, but
rather the values of maximum voltage, voltage step and step time
value. The instrument will start the test by applying the value of the
voltage step and increase this value at each programmed time interval
until it reaches the maximum voltage value.
step
voltage
To configure these parameters follow the instructions below:
• Access the device's MENU using the
• Use the control
• Use the control
Maximum current
9.4.1.
(See 9.1.1, pg. 24)
step time
, to select SETUP TEST and press
SETUP TEST
LANGUAGE
SETTINGS
, to select SVT and press
29
HP
button.
.
.
80KV