Miele PDW 909 Instrucciones De Instalación página 27

Columna lavado-secado
Ocultar thumbs Ver también para PDW 909:
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 71
Explanation of the safety notes and warnings on the machine
Read the operating instructions
Read all the instructions, e.g. the installation instruc-
tions
Warning, hot surfaces
Warning, voltage up to 1000 volts
Earthing
Equipotential bonding
Installation requirements
The washer-dryer stack may only be commissioned by the Cus-
tomer Service Department or by a Miele specialist dealer.
The washing machine or tumble dryer must not be operated as indi-
vidual machines.
The washer-dryer stack must be installed in accordance with ap-
plicable regulations and standards. Local energy supplier and water
authority regulations must also be observed.
This washer-dryer stack must only be operated in a room that has
sufficient ventilation and is frost-free.
This washer-dryer stack should not be installed or operated in any
area where there is a risk of explosion.
Transportation and site access
The machine must not be moved without the transit bars in place.
Keep the transit bars in a safe place. They must be refitted if the ma-
chine is to be moved again (e.g. when relocating the machine).
General operating conditions
This washer-dryer stack is intended only for use in a commercial envir-
onment and must only be operated indoors.
- Ambient temperature: 0-40 °C
- Relative humidity: non-condensing
- Maximum height above sea level of location site: 2000 m
Depending on the nature of the installation site, sound emissions and
vibration may occur.
en - Installation notes
27
loading

Este manual también es adecuado para:

Pdw 909 [el dp dd]