Proteco Shark 24V Manual De Uso E Instalación página 6

Idiomas disponibles

Idiomas disponibles

SAFETY CRITERIA
1
Attention: before beginning anykind of procedure of installation is
absolutely necessary to read all this manuall.
2
Test/Control that the perfornces of the actuator auswer to your
installation needs.
3
Besides control that:
• The gare hinges are in good conditions and perfectly fattened.
• The gate has mechanicall stops in the opening and the closing.
INSTALLATION ADVICE
Connections:
See the "Operational Diagram" and refer to the control central scheme.
The adjustment must be effected when the device has no power supply.
Foresee a omnipolar breaking device near to the apparatus (the contact
must measure at least 3 mm).
Always protect the power supply using a 6A automatic switch, or a 16A Following the instructions, choose the exact position of the gear motor
single-phase switch fises.
The power supply lines the motors, to the control unit and the connection
lines to the outfits must be sepated to avoid troubles which could
generate problems in the installation working.
Any outfits (of control or safety) eventually connected to the control unit
must be tension free.
Spare parts:
use esclusively original spare parts.
Installation:
In order to correctly use the product and to exclude the possibility of
injury or damage, refer to the "Generals" page enclosure, which is an
integrated part of this manual.
The use of this equipment must be in observance of the safety standards
in force in the country where it is installed, as well as the standards
governing proper installation.
Warranty:
The warranty supplied by the manufacturer becomes void in the event of
interference, carelessness, improper use, lightening damage, power
surges or use by unqualified personnel.
The warranty will also become void in the event of the following:
Failure to observe the instructions given in the manuals supplied with the
product.
The application of any part in a manner differing from that provided for -
current legislation or the use of spare parts which are unsuitable and/or
not approved by manifacturer.
The manufacturer cannot be held responsible for damages due to -
improper or unreasonable use.
INSTALLATION INSTRUCTION SEQUENCE
1
Before the installation, anomalyse the risks referring to the chapter
"Generalities" of this instructions manual, fill the technic table and
eliminate the risks a noticed.
In case of more risks, foresee the installation with security system.
2
Est the security laws of the "Security Criteria".
3
Control all the components.
4
Decide the position where you want to install the gear motor.
5
After deciding the right position tou have to make a digging on the
Ground.
6
Install the Protection box in the digging on the Ground.
7
Foresee a discharge for the water.
8
Connect the Electrical cables as in the "Operational Diagram"
9
Put the gear motor on the botton of the Box and fasten it firmly inside the Protection box moving it of 180°.
protection.
10 Install the levers for the gate movement
11
Close the Protection box.
12 Aligne and fix the leaf of the gate.
13 Connect the central and all the accessoires
14 Program the radio receptor
15 Pèrogram working times
In case of badworking, see the "Anomalies and Counsuls"
IF YOU DO NOT FIND ANY SLUTION COLL THE NEATEST ASSISTENCE -
CENTRE.
LOCKED ACTUATOR
The gear motor may with trasmission and drive lever be either locked.
The electric lock must be installed on the wing that opens first and must be
connected with the terminal board of the control unit.
Position of the electric lock: (Fig. C).
Position 1: Lock between the wings.
(in this case is necessary to use the bolt RT15 on the second wing)
Position 2: Lock in the floor.
(in this case the utilisation of the bolt is not essential)
In any other case, we suggest the locked actuator.
In this case remenber to remove the lock or at least block the lock in opening
position and take away all the bolts of lock.
DETERMINATION OF FIXING MEASURES
paying attention to the structure and the opening you want.
GATE FIXED IN THE MIDDLE OF THE PILLAR (FIG. A)
In this case the maximal opening corner of the gate is 90°.
GATE FIXED ON THE EDGE PILLAR (FIG. B)
In this case the gate can open with a corner superior to 90°. (max 110°)
PROTECTION BOX (FIG. D)
-
Make, in the established position, a digging on the ground which can
cobtain the Protection box.
-
Put the Protection box into the digging.
Make sure that the pin is aligned with the pivot of the leaf and that you
have respected the distance of 65 mm between the centre of the pivot
and the piller. (Fig. E)
-
Make near the holes F1 of the Protection box a discharge for the water
in order to avoid a possible back water as well as an oxidation of the gear
motor. (Fig. F)
-
Notioe that the electrical cables have to go through the hole F2 of the
Protection box, as in the "Functional scheme for swing gate". (Fig. N)
-
Make sure that the Protection box is perfectly horizontal and bury it with
concrete.
Put the gear motor on the bottom of the Protection box and fasten it
firmly to the tapping-screw with the right nuts M12. (Fig. F)
-
Install the lever "L1" on the pin which comes out from the box. (Fig. G)
Install the lever "L2" lever of Transmission on the "L1" ( just installed).
(Fig. H)
-
Juin the lever "L2" to the lever "L3" (coming out from the gear motor) by
driving thepins into the right pivots and them with screws SPEI M6X18.
(Fig. H)
-
Closed the Protection box, with the cover and fasten it with the right
screw M6x18 TPSCEI.
-
Aligne both the leaf of the gate and the lever "L1" which comes out from
the Protection box. Fix them all with soldering.
MECHANICAL STOP
Now it is necessary to put the locks in order to make the openin and in the
closing of the swing.
GATE WITH EXTERNAL OPENING
If the gate has an external opening it is possible to put the motor in to the
MOTOR RELEASE
-
Turn off the electricity.
-
Put the release key in the correct hole on the release lever and turn the left
clockwise, whereas the right leaf in the other direction.
In this way you will release the transmission. (Fig. I)
Take out the key and do the emergency manouvre.
-
Now it is possible to open and to close the gate handly.
In order to re-estabilish the transmission, you have to put the leaf in the
starting position (the clutch is auomatic).
-
Re-estabilish the power supply.
DEVICE 180° (A 008)
The device has been applied to particular cases, to allow openings util 180°.
For a correct installation of the device 180°, fallow carefully these
instructions:
-
Find out the pinion P1 on the gear motor. (Fig. L)
-
Mount the lever with pinion P2 on the pin which comes out from the box.
-
put the transmission key "C" on the spur wheel, stretch it and fasten it.
-
Grease the chain. Close the box with the cover and fix it with suitable
screws M6x18 TPSCEI.
-
Aligne both the leaf of the gate and the lever L1 which comes out from the
box. Fix them all with soldering.
-
Repeat the same operation with the other leaf.
GEAR MOTOR
loading

Este manual también es adecuado para:

Shark 230vShark oil