Maintenance And Diagnosis Of Failures; Maintenance; Operations Counter - Erreka DOLFIN DOS424E Manual Del Instalador

Accionador de correa para puertas corredera
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

MAINTENANCE AND DIAGNOSIS OF FAILURES

1

MAINTENANCE

Before carrying out any maintenance operation, disconnect the device from the power supply.
1 Frequently check the facility in order to discover any
imbalance or sign of deterioration or wear. Do not
use the operator if any repair or adjustment is
necessary.
2 Clean and lubricate the articulations and tracks of
the gate, so as not to increase the effort of the
operator.
2

OPERATIONS COUNTER

1 Press ENTER to access the main programming menu.
The display lights up and D1 flashes.
2 Press the buttons ^ and
ç.
D3 and D4 show the number of operations
carried out (hundreds of operations).
3 Press ESC to return.
D1
D2
Parameter
ç
1
Operations carried out
64
Installation Manual
until D1 shows the letter
V
D3
D4
X
X
3 Check that the key devices, strips and photocells, as
well as their installation, have not suffered any
damage from the weather or external agents.
4 Check unlocking can be carried out easily.
5 Check the operations in the display (see "Operations
counter" below).
Default option
Options or values
Indicates the hu ndr ed s of cycles
completed (for example,
6,800 cycles completed
68
indicates
)
Tabla de contenido
loading

Este manual también es adecuado para:

Dolfin dos424em

Tabla de contenido