CONECTION
WARNING
Before the generator can be connected to a building's electrical system , a licensed electrician must install an isolation
(transfer)switch in the building's main fuse box. The switch is the connection point for generator power and allows selec-
tion of generator or main line power to the building .This will prevent the generator from charging the main power line
(back feeding)when the main power sup ply has failed or has been turned off for line repair. backfeeding can electrocute
or injure line maintenance personnel. Also , generator and building electri cal system damage can occur when normal
operating power returns if unit is used without an auto-switch.
DANGER
Always use proper approved electrical cords. Besure to comply with all electric codes.
Do not use electrical cords that are worn or damaged. Always use GFCl(ground fault circuit interuptor) for damp loca-
tions.
Always use proper approved transfer switch to isolate generator from the electric panel.
LOCATION OF IMPORTANT LABELS
Please read the following labels carefully before oper ating this product.
4
www.ducsonpower.com