ELDA - CORONA
8.3.7. VARIOUS CHECKS
When the hopper is completely empty, unplug the unit's power cable and remove the residues (dust, chips, etc.)
from the hopper, before filling it.
All the sealing gaskets fitted on the pieces and components involved in maintenance (fume extractors, inspection
doors, exhaust manifolds, fire doors, etc.) must be replaced by the authorized service center at the time of the
intervention. At the end of maintenance work, check the tightness of the seals/gaskets and the correct operation
of the unit.
All maintenance operations must be carried out with the unit cold and the power
supply disconnected, using a suitable vacuum cleaner and tools for thorough
cleaning.
9.
SERVICE MESSAGE MAINTENANCE
Every 1800 operating hours or 2000 kg of pellets burned the unit alerts, via a "SERVICE" message, the request
for maintenance (not under warranty) to be planned with an authorized service center, which provides for complete
maintenance and message resetting.
Before any intervention, make sure the power supply is disconnected and that
the unit is completely cold.
Failure to comply with the above indications can compromise the safety of the
unit and may void the right to the warranty conditions.
10. STORAGE AND DISPOSAL
10.1 SETTING ASIDE FOR PERIODS OF INACTIVITY
If the unit is not being used for long periods (and/or at the end of each season), proceed as described:
Step
Action
1
Remove all pellets from the hopper.
2
Disconnect the power supply.
3
Clean carefully and, if necessary, have damaged parts replaced by qualified personnel.
4
Protect the unit from dust with suitable covering.
5
Store in a dry and safe place protected from the weather.
EN
A73023860 - Rev 01 - 06/2023
207