Connections And Control Devices; Water Connection; Starting Procedure - ESAB Warrior Feed 304 Manual De Instrucciones

Ocultar thumbs Ver también para Warrior Feed 304:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

5 OPERATION
5.2

Connections and control devices

1.
Display voltage (V)
2.
Display current (A)
3.
Knob for setting the wire feed speed
4.
Knob for setting the voltage
5.
Switch for wire inching or gas purge
6.
Connection RED for cooling water from
welding torch *)
7.
Connection BLUE for cooling water to the
welding torch *)
8.
Connection for the welding torch
NOTE!
*) Cooling water connections only available on certain models.
5.3

Water connection

When connecting a water-cooled welding torch, the main power supply switch of the power
source must be in the OFF position and the cooling unit switch must be in position 0.
A water connection kit can be orderred as accessory, see chapter "Accessories".
5.4

Starting procedure

When the wire feed starts, the power source generates welding voltage.
If there is no welding current flow within three seconds, the power source switches the
welding voltage off. The wire feed continues until the welding torch's switch is switched off.
9.
Switch for 4 stroke / 2 stroke (inside)
10.
Switch for Cored wire / Solid wire (inside)
11.
Switch for Creep start (inside)
12.
Connection for welding current from power
source (OKC)
13.
Connection for control cable from power
source
14.
Connection for shielding gas
15.
Connection BLUE for cooling water from
power source (cooling unit) *)
16.
Connection RED for cooling water to
power source (cooling unit) *)
- 68 -
© ESAB AB
Tabla de contenido
loading

Este manual también es adecuado para:

Warrior feed 304w

Tabla de contenido