Cardin Elettronica SLX324 Instrucciones Para La Instalación página 15

Automatización para cancillas correderas con motor de corriente continua
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 38
INSTALLATION INSTRUCTIONS
Overall dimensions and positioning
• The geared motor must be correctly positioned when it is installed: perpendicular to the ground and straight up on flat ground.
340
5
- The geared motor unit has been assembled in the factory to be
fitted to the LEFT SIDE of the gate (internal view).
To install the motor to the right set the installation parameter (see
page 19).
Anchoring the unit (fig. 6, 7)
Important! Check the exact anchoring position with respect to the alignment of the sliding gate.
• Run the piping and connection wires to the position where the motor is to be installed.
• Attach the anchor bolts to the base plate "A" allowing them to protrude by 50 mm and then tighten down using
the supplied M12 nuts.
• Prepare a cement plinth, in the position where the motor is to be installed, with a depth of 350 mm (the base
should protrude by about 25 mm to avoid damage by pools of water building up under the appliance).
• Insert the base plate making sure that:
- the electrical cables pass through the hole "B";
- the anchor bolts "C" are immersed into the cement base and the base plate is perfectly level;
- the four protruding threaded bolts are perpendicular to the base plate;
- the surface area of the base plate is clean and free of cement residue.
If the runner guide already exists the cement base should be extended to take in part of the runner guide foundation.
This will stop the two foundations from giving way separately.
- Unscrew the four M12 nuts on the four threaded bolts (previously used to block the anchor bolts) from the base
of the anchor plate. Then insert the four washers and allow them to rest on the nuts.
- Position the geared motor over the four threaded bolts and allow it to rest on the four washers.
- Fasten in to the base using the other four washers and
adjustment nuts supplied with the kit, making sure that the unit remains perfectly level and stable.
- Adjust the height if the unit using the four grub screws already positioned on the motor. This will allow you to
adjust the height and position of the motor later on.
Fitting the toothed rack
- release the geared motor (fig. 8), lay the
first stretch of the toothed rack on the
pinion and fix it to the gate, then fasten
down all the other parts along the entire
length of the gate.
- after having fastened the toothed rack,
realign the pinion (play of 1 to 2 mm
between the toothed runner and the
pinion) using the grub screws at the
base of the geared motor. This action
will prevent the weight of the sliding gate
from damaging the unit when working.
256
56
30
All rights reserved. Unauthorised copying or use of the information contained in this document is punishable by law
2 mm
All rights reserved. Unauthorised copying or use of the information contained in this document is punishable by law
170
170
All rights reserved. Unauthorised copying or use of the information contained in this document is pun
SCALA: 1:2
Drawing number :
DI0237
Product Code :
SL1524M
Draft :
P.J.Heath
Date :
30-01-2002
CARDIN ELETTRONICA S.p.A - 31020 San Vendemiano (TV) Italy - via Raffaello, 36 Tel: 0438/401818 Fax: 0438/401831
ANCHORING
THE UNIT
Plan view
ANCHORING
THE UNIT
Side view
15
SCALA: 1:2
perpendicular to the ground
B
C
Toothed rack
Description :
Prodotti Technocity
CONTROPIASTRA SL1524M
Base plate
34
69
157
104,5
7
4
6
2
M 1
A
Gate
loading

Este manual también es adecuado para:

Slx serie100/slx324