Toto YT820 Manual De Instrucciones Y Del Propietrario página 4

Placa de empuje convexa
Idiomas disponibles

Idiomas disponibles

1) Use a bucket to drain the water
supply line from any debris. Let the
water runs for a minute.
2) Connect the hose to the fill valve
and turn on the water supply valve.
Check for any leaks.
3) Place the actuator in the tank front
opening as shown above. Ensure
that the top and rear tabs along
the top edge hook into top edge
of the front tank opening.
4) Make sure the hooks of the
actuator go into the fill valve
handles. Then secure the actuator
by turning the 2 gray knobs
clockwise by half turn.
5) Adjust the threaded studs indicated above (top left & bottom right) be 3/8" [10mm]
from the wall surface.
INSTALLATION PROCEDURE
4
"
[1
0
m
m]
loading