Premium EPS-120-5192 Manual De Operación página 24

Ocultar thumbs Ver también para EPS-120-5192:
Idiomas disponibles

Idiomas disponibles

8. COMMISSIONING
Before commissioning the device, make sure that all the connections are correct, and that they respect the
polarities indicated on the front of the unit.
The temperature sensor is responsible for informing the charger of the ambient temperature of the battery, in
order to allow the charging parameters to be adjusted accordingly. It should be installed in the same room or
cabinet as the battery, as close to the battery as possible. It does not need to be in contact with the battery.
This device does not have a power switch, so once the input voltage is supplied to terminals "1 Phase and 2
Neutral", it starts to operate.
If everything is correct, 5 seconds after connection, the green "Device ON" LED and the green "Charging
mode" LED will be switched on, either steady or blinking, depending on the battery charge status. All the other
LEDs should remain off in normal operation.
If this is not the case, see section "4.5 Signals" to find out where the incident is located. If this does not solve
the problem, see section "14 Diagnostics"
During the installation of the device, it is necessary to check that it is properly grounded. To do so, it is
necessary to verify that the charger's grounding point is properly connected.
This device does not require an electrical protective ground as its plastic enclosure is able to withstand
electrical strength tests. For this reason, the device ground should not be considered electrically safe.
The grounding of this equipment is functional, and its connection is necessary to ensure that the equipment
complies with the specified conducted and radiated emission levels.
www.premiumpsu.com
Powering Your Challenge
Serie EPS
Manual de Operación
MA-5192A-1
20-10-2021
24 / 84
loading

Productos relacionados para Premium EPS-120-5192

Este manual también es adecuado para:

Eps-200-5193