Lionelo Stefi Plus Manual De Usuario página 7

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 24
Base installation
The base should be attached using the zipper. Once the base is attached, secure
the zipper with a buckle and cover it with a Velcro pad. Slide the reinforcement
tubes into the sewn handles and connect them (they must be paired properly).
Place the mattress onto the tube-reinforced base and fasten it with Velcro from
below (fig. 6).
The cot folding instruction
1.
Remove all the cot accessories. Remove the mattress. Grasp the centre handle
located in the middle of the floor and pull it up (see fig. 7). The upper level
base doesn't need to be taken down before folding.
2.
To unlock the upper rails, press the indicated buttons on each side of them.
Pull it slightly up and then push it down. Unlock the shorter sides first, and
then do the same with the longer ones (fig. 8).
3.
While still pulling up the handle, lift the floor of the cot and fold the legs
(see fig. 9).
4.
Wrap the folded cot with the mattress and fasten it with Velcro straps. Put
the folded cot into the bag (see fig. 10).If thes disassembly is unsuccessful,
repeat the whole process again until the product is folded.
Cleaning
Wipe the product with a damp cloth, then allow to dry.
Do not dry clean and do not use caustic agents. Do not dry mechanically, do
not iron.
The product has been tested and meets all the requirements of the:
EN 716-1:2017+AC:2019.
The pictures in this manual are for illustrative purposes only. Therefore, they may differ
from the actual product.
‑ 7 ‑
EN
loading