ASSEMBLY INSTRUCTIONS
7
8
Green & White
All manuals and user guides at all-guides.com
Fasten the condenser (by lifting the tab on the
7.
machine bottom side) by inserting the condenser
screw into the special hole, and tighten it with the
supplied nut.
8. Implement
condenser and motor pump. Note: (The motor pump
connection terminals are designed to prevent
inverting the winding connections).
9. TESTING:
Check that there is no leak in the hydraulic
connections (check to be performed during the motor
pump operation).
The motor pump should start at the machine filling
and any time the machine supplements water into the
boiler (that is, at any rinsing) .
the
electrical
connections
P a g e 7
between