Installation Precautions; Installation Requirements; Drain Hole Position - EAS ELECTRIC EMCH Serie Manual De Instrucciones

Ocultar thumbs Ver también para EMCH Serie:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

7 INSTALLATION PRECAUTIONS

7.1 Dimensions
Model
A
B
5-16kW
1040
410

7.2 Installation requirements

Check the strength and level of the installation ground so that the unit may not cause any vibrations or
noise during its operation.
In accordance with the foundation drawing in the figure, fix the unit securely by means of foundation bolts.
(Prepare four sets each of Φ10 Expansion bolts, nuts and washers which are readily available in the market.)
Screw in the foundation bolts until their length is 20 mm from the foundation surface.
Φ10 Expansion
bolt
Rubber
shocking
proof mat
Solid
ground
Concrete
≥80
or roofing
basement
h≥100mm

7.3 Drain hole position

I
J
K
E
D
C
B
C
D
E
458
523
191
(unit: mm)
≥100
Drain hole
F
G
A
F
G
656
64
09
H
(unit:mm)
H
I
J
865
165
279
This drain hole is
covered by rubber
plug. If the small
drain hole can not
meet the drainage
requirements, the
big drain hole can
be
used
at
the
same time.
K
89
V.1
Tabla de contenido
loading

Este manual también es adecuado para:

Emch-09r1Emch-12r1Emch-16r3

Tabla de contenido