Side Mounting; Typical Layout Diagram; With Navigator Controller - Varian TV 301 Manual De Instrucciones

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 12

Side mounting

NOTE
The L-shaped bracket (P/N 969-9349) is available
as an option.
See the following figure.
1. Screw the 4 fixing studs (provided with the ac-
cessories bag) in the holes on the L-shaped
bracket;
2. Place the controller on the studs aligning the 4
rubber holes on the top of the controller;
3. Press the controller towards the bracket;
4. Turn the pump upside-down;
5. Place the bracket on the pump bottom;
6. Screw a little bit the three screws M4 in the
holes on the pump bottom;
7. Rotate the bracket until the controller is on the
chosen position;
8. Tighten the screws properly;
9. Turn the pump again;
10. Plug the line cord and connect the pump cable
to the pump;
11. Connect the mating connector with the jumper
on the interlock signal to start the pump.
MOUNTING 2
All manuals and user guides at all-guides.com
43
TECHNICAL INFORMATION

TYPICAL LAYOUT DIAGRAM

With Navigator Controller

1.
Turbo-V Navigator controller
2.
Vent valve
3.
Vacuum pump shut-off valve (optional)
4.
System vent valve (optional)
5.
Vacuum chamber
6.
Ionization gauge
7.
Fore-vacuum pump connecting flange
8.
Oil mist eliminator
9.
Fore-vacuum pump with internal one-way
valve
10. Fore-vacuum pump control relay
11. Connection for water cooling
12. Roughing line with valve (optional)
13. Turbopump
14. Fan
15. Flexible connection
87-900-946-01(B)
Tabla de contenido
loading

Tabla de contenido