Technical Data Plate - Sime AQUA HE 25 ErP BE Instrucciones Para El Instalador

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

1.6

TECHNICAL DATA PLATE

YEAR OF CONSTRUCTION
WATER CONTENT IN BOILER
MAX OPERATING PRESSURE
HEAT INPUT MAX D.H.W.
MAX OPERATING PRESSURE D.H.W.
MAX POWER ABSORBED
1.7
CONNECTION OF
CONDENSATION
WATER TRAP (fig. 3/b)
The. drip. board. and. its. water. trap.
must. be. connected. to. a. civil. drain.
through.a.pipe.(ø.25).with.a.slope.of.
at. least. 5. mm. per. metre. to. ensure.
drainage.of.condensation.water..
The plastic pipes normally used for
civil drains are the only type of pipe
which is appropriate for conveying
condensation to the building's
sewer
pipes..
74
MODEL
SERIAL NUMBER
HEAT INPUT MAX
HEAT OUTPUT MAX
CONTENTS D.H.W.
D.H.W. FLOW RATE
POWER SUPPLY
1
KEY
. 1. Drain.hose
. 2. Condensate.drain.tap
CODE
DIRECTIVE OF REFERENCE
PIN NUMBER
TYPE
MAX OPERATING PRESSURE
MAX OPERATING PRESSURE D.H.W.
2
Fig..3/b
Tabla de contenido
loading

Este manual también es adecuado para:

Aqua he 35 erp beAqua he 25 inox erpAqua he be 35 inox erp be

Tabla de contenido