Hotpoint Ariston PC 750 T X /HA Manual De Instrucciones página 17

Ocultar thumbs Ver también para PC 750 T X /HA:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

There is an adjustable L L L L L -shaped pipe fitting on the
appliance supply ramp and this is fitted with a seal in
order to prevent leaks. The seal must always be replaced
after rotating the pipe fitting (seal provided with
appliance). The gas supply pipe fitting is a threaded 1/2
gas cylindrical male attachment.
Connecting a flexible jointless stainless steel pipe to a
threaded attachment
The gas supply pipe fitting is a threaded 1/2 gas cylindrical
male attachment.
These pipes must be installed so that they are never
longer than 2000 mm when fully extended. Once
connection has been carried out, make sure that the
flexible metal pipe does not touch any moving parts and
is not compressed.
! Only use pipes and seals that comply with current
national regulations.
Checking the tightness of the connection
! When the installation process is complete, check the
pipe fittings for leaks using a soapy solution. Never use a
flame.
Adapting to different types of gas
To adapt the hob to a different type of gas other than
default type (indicated on the rating plate at the base of
the hob or on the packaging), the burner nozzles should
be replaced as follows:
1. Remove the hob grids and slide the burners off their
seats.
2. Unscrew the nozzles using a 7 mm socket spanner,
and replace them with nozzles for the new type of gas
(see table 1 "Burner and nozzle characteristics").
3. Reassemble the parts following the above procedure in
the reverse order.
4. Once this procedure is finished, replace the old rating
sticker with one indicating the new type of gas used.
Sticker are available from any of our Service Centres.
Replacing the nozzles on separate "double flame "
burners:
1. remove the grids and slide the burners from their
housings. The burner consists of 2 separate parts ( see
figure );
2. unscrew the burers with a 7 mm wrench spanner. The
internal burner has a nozzle, the external burner has
two (of the same size). Replace the nozzle with models
suited to the new type of gas (see table 1).
3. replace all the components by repeating the steps in
reverse order.
All manuals and user guides at all-guides.com
Replacing the Triple ring burner nozzles
1. Remove the pan supports and lift the burners out of
2. Unscrew the nozzles using a 7 mm socket spanner.
3. Replace all the components by completing the above
• Adjusting the burners' primary air :
Does not require adjusting.
• Setting the burners to minimum:
1. Turn the tap to the low flame position.
2. Remove the knob and adjust the adjustment screw,
3. Having adjusted the flame to the required low setting,
4. Some appliances have a safety device (thermocouple)
5. Once the adjustment has been made, replace the seals
their housing. The burner consists of two separate parts
(see pictures).
Replace the nozzles with models that are configured
for use with the new type of gas (see Table 1). The two
nozzles have the same hole diameter.
operations in reverse order.
which is positioned in or next to the tap pin, until the
flame is small but steady.
while the burner is alight, quickly change the position of
the knob from minimum to maximum and vice versa
several times, checking that the flame does not go out.
fitted. If the device fails to work when the burners are
set to the low flame setting, increase this low flame
setting using the adjusting screw.
on the by-passes using sealing wax or a similar
substance.
GB
17
Tabla de contenido
loading

Este manual también es adecuado para:

Pc 750 t ax /haPc 750 t gh /haPc 750 t xx /haPc 750 t r /haPc 750 t /haPc 760 f x /ha ... Mostrar todo

Tabla de contenido