6. Unit handover
The Hydrim M2 unit as per the details above (page 1) has been satisfactorily installed and
tested, and the users mentioned in 4 above have been trained in the use of the unit.
Approved by:
Installation engineer
Signature:
Customer/Main User
Signature:
Copy document and give one to customer and keep one on unit service record.
All manuals and user guides at all-guides.com
Name (print):
Name (print):
7
Date:
Date:
SD-355