2.2.2. CONNECTION TO WATERWORKS

− Connect the water outlet with a floor grid or with the sewerage, leaving an air head.
The water outlet is pre-arranged in the lower left back part of the apparatus.
-
− Make connections according to regulations currently in force.

2.3. COMMISSIONING AND TESTING

− Once all the connections have been made, the appliance and the overall installation
must be checked following the directions given in this manual.
− Check in particular:
− that the protective film has been removed from the external surfaces;
− that the terminal board housing, removed for electrical connections, has been
reinstalled.
− that connections have been made in accordance with the requirements and
directions indicated in this manual;
− that all safety requirements in current standards, statutory regulations and
directives have been met;
− that the electrical connection has been performed according to standards.
− Furthermore, make sure that the cable which connects the apparatus with the control
board is not subject to traction and that it is not in contact with warm surfaces.
− Now proceed to light the appliance as directed in the instructions for use.
− While the appliance is in use, voltage should not differ from the nominal voltage more
than +/- 10%.
− The test report must be completed in full and submitted to the customer who should
then sign in acceptance. With effect from this moment, the appliance is covered by the
manufacturer's warranty.