Checking/Test Running And Configuring The Control Panels; General; Switching On A Panel; Switching Off A Panel - Vetus BOW PRO A Serie Instrucciones De Instalación

Ocultar thumbs Ver también para BOW PRO A Serie:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 57
6

Checking/test running and configuring the control panels

6 .1

General

• Switch on the main switch.
After switching on the power a beep will sound at each control panel
fitted.
The system is now in 'stand-by' . The panel or both the panels are not
activated.
6 .2

Switching on a panel

• Press the 'ON/OFF' switch twice.
After the switch is pressed once the LED will flash green and the
buzzer will sound continuously didididididi..... (. . . . . . .) The 'ON/OFF'
switch must be pressed a second time within 6 seconds. The LED
(blue) will remain on and the buzzer will confirm that the panel is
ready for use by giving the signal dahdidah (- . -).
If a second panel is connected the LED on the panel 'which has not
been switched ON' will flash (every second two short blue flashes,
heartbeat)
Keep to the following sequence for configuring the panels:
6 .4

Configuring the panels

• Implement the configuration or the panel for controlling a bow or
stern thruster as in section 6.5.
• Implement the configuration for the helm station where the panel
is sited as in section 6.6.
• If during test running it emerges that the movement of the boat
is opposite to the direction the joystick is moved in, this can be
modified as indicated in 6.7.
The illustrated operations must be performed on EACH panel in-
stalled .
vetus® Installation instructions BOW PRO Series Thruster: BOWA0301
n
ote
Do not test the bow thruster when the boat is out of the water
unless you are convinced that everyone is at a safe distance
from the propeller tunnel .
ON/OFF
BPPPA
6 .3

Switching OFF a panel

Press once the 'ON/OFF' switch, the buzzer will reply with the signal
didididahdidah ( . . . - . - ).
• Turn off the battery main switch when leaving the boat.
1) Configuring a panel for operating a bow or stern thruster (see sec-
tion 6.5),
2) Configuring a panel for the helm station where the panel is situa-
ted (see section 6.6),
3) Changing the thrust force direction (only if this proves necessary
during test running, see section 6.7).
3
ENGLISH
W
arninG
ON/OFF
BPPJA
OR
2
1
020802.03
29
Tabla de contenido
loading

Este manual también es adecuado para:

Bowa0301

Tabla de contenido