Gessi goccia 35299 Manual De Instrucciones página 17

Tabla de contenido
INSTALLATION - INSTALLATION - INSTALACIÓN
Plasterboard ceiling - Plafond en Placoplâtre - Techo de cartón-yeso
Installation (Plasterboard ceiling)
Remove the spout from the pipe without damaging it.
Fig. 9 -Piercewitha1/2"D.[12mm]bitinthepreviouslyindicatedpoints.
Fig. 10 - Introduce plugs as indicated.
Fig. 11 - Screw the mouth to the supply pipe approaching as much as possible to the suspended ceiling
with the fastening plate and make holes coincide with plugs.
Fig. 12 - F asten firmly the mouth to the ceiling with the screws supplied so that the anchorage is
effective.
Fig. 13 -Letthefinishrosetteslideuptotheceiling.
Installation (Plafond en Placoplâtre)
Retirer la bouche du tube sans l'endommager.
Fig. 9 -Perceravecunepointe1/2"D.[12mm]auxpointsprécédemmentrepérés.
Fig. 10 - Introduire les chevilles comme indiqué.
Fig. 11 - Visser la bouche sur le tube d'alimentation en rapprochant le plus possible la plaquette de
fixationdufauxplafondetfairecoïncidersestrousavecleschevilles.
Fig. 12 -Fixeravecforcelabouchesurleplafondaveclesvisfourniesafinquel'ancragefonctionne.
Fig. 13 -Fairecoulisserlarosacedefinitionjusqu'auplafond.
Installación (Techo de cartón-yeso)
Quitenelcañodeltubosindañarlo.
Fig. 9 -Horadenconunabroca1/2"D.[12mm]lospuntosanteriormentemarcados.
Fig. 10 - Introduzcan los tacos como indicados.
Fig. 11 - A tornillenelcañoaltubodealimentaciónacercándoselomásposiblealfalsotechoconelplato
defijaciónyhagancoincidirloshuecosconlostacos.
Fig. 12 - F ijenconfuerzalabocaaltechoutilizandolostornillosincluidosenelsuministroparaqueel
anclajetengaéxito.
Fig. 13 -Hagandeslizarelfloróndeacabadohastaeltecho.
17
Tabla de contenido
loading

Este manual también es adecuado para:

Goccia 35399

Tabla de contenido