Gessi goccia 35299 Manual De Instrucciones página 15

Tabla de contenido
INSTALLATION - INSTALLATION - INSTALACIÓN
Installation (Concrete ceiling)
Remove the spout from the pipe without damaging it.
Fig. 4 -Piercewitha1/4"D.[6mm]bitinthepreviouslyindicatedpoints.
Fig. 5 - Introduce plugs as indicated.
Fig. 6 - Screw the mouth to the supply pipe approaching as much as possible to the ceiling with the
fastening plate and make holes coincide with plugs.
Fig. 7 - F asten firmly the mouth to the ceiling with the screws supplied so that the anchorage is
effective.
Fig. 8 -Letthefinishrosetteslideuptotheceiling.
Installation (Plafond en ciment)
Retirer la bouche du tube sans l'endommager.
Fig. 4 -Perceravecunepointe1/4"D.[6mm]auxpointsprécédemmentrepérés.
Fig. 5 - Introduire les chevilles comme indiqué.
Fig. 6 - V isserlabouchesurletubed'alimentationenrapprochantlepluspossiblelaplaquettedefixation
du plafond et faire coïncider ses trous avec les chevilles.
Fig. 7 -Fixeravecforcelabouchesurleplafondaveclesvisfourniesafinquel'ancragefonctionne.
Fig. 8 -Fairecoulisserlarosacedefinitionjusqu'auplafond.
Installación (Techo de hormigón)
Quitenelcañodeltubosindañarlo.
Fig. 4 -Horadenconunabroca1/4"D.[6mm]lospuntosanteriormentemarcados.
Fig. 5 - Introduzcan los tacos como indicados.
Fig. 6 - A tornillenelcañoaltubodealimentaciónacercándoselomásposiblealtechoconelplatode
fijaciónyhagancoincidirloshuecosconlostacos.
Fig. 7 - F ijenconfuerzalabocaaltechoutilizandolostornillosincluidosenelsuministroparaqueel
anclajetengaéxito.
Fig. 8 -Hagandeslizarelfloróndeacabadohastaeltecho.
Concrete ceiling - Plafond en ciment - Techo de hormigón
15
Tabla de contenido
loading

Este manual también es adecuado para:

Goccia 35399

Tabla de contenido