Enlaces rápidos

All manuals and user guides at all-guides.com
BATH MIXING PROGRAM
PROGRAMME DU MITIGEUR POUR LA SALLE DE BAIN
PROGRAMA MEZCLADORES BAÑO
Art. 35344
Installation of built-in parts
Installation des parties de l'encaissement
Instalación partes por empotrar
Gessi SpA - Parco Gessi
13037 Serravalle Sesia (Vercelli) - Italy
Phone +39 0163 454111 - Facsimile +39 0163 459273
www.gessi.com - [email protected]
loading

Resumen de contenidos para Gessi 35344

  • Página 1 PROGRAMA MEZCLADORES BAÑO Art. 35344 Installation of built-in parts Installation des parties de l’encaissement Instalación partes por empotrar Gessi SpA - Parco Gessi 13037 Serravalle Sesia (Vercelli) - Italy Phone +39 0163 454111 - Facsimile +39 0163 459273 www.gessi.com - [email protected]...
  • Página 2 MUST NEVER BE EXCEEDED, as it may damage and/or cause ruptures and/or leakages and/or even break the product, and present a potential hazard and danger to safety, health and/or property. Following are the technical data with respect to the installation of Gessi plumbing products. ► W orkingpressureshouldnotbelowerthan0,5bar(7,25psi)andnotbehigherthan5bar(72Psi).In case of higher working pressure use a pressure reducer valve.
  • Página 3: Attention - Avertissement

    Ci-dessous nous indiquons les données techniques concernant l’installation des produits sanitaires Gessi. ► L apressiondeservicenedoitpasêtreinférieureà0,5bar(7,25psi)etsupérieureà5bar(72Psi).En cas de pressions de service plus hautes utiliser une soupape de réduction de la pression.
  • Página 4: Cuidado - Advertencia

    1 - ¡CUIDADO!! LES ROGAMOS QUE TENGAN EN CUENTA QUE NUNCA la presión y/o la temperatura máximaaconsejadaNOTIENEQUESERSUPERADA,yaquepodríadañary/ocausarrupturasy/o pérdidasy/oaveríasdelproductoy,porlotanto,representarunriesgoyunpeligropotencialpara la seguridad, la saludad y/o la propiedad. A continuación Les proporcionamos los datos técnicos relativosalainstalacióndelosproductosdegriferíaGessi. ► L apresióndeejercicionotienequeserinferiora0,5bar(7,25psi)ysuperiora5bar(72Psi).Encaso depresionesdeejerciciomayores,utilicenunaválvuladereduccióndelapresión. ►Presiónmáximadeensayodurantelainstalación:8bar(116psi). ► E vitengrandesdiferenciasdepresiónentrelaalimentacióndelaguafríayaquelladelaguacaliente. Lasdiferenciasdepresión,elaguaconunalatocontenidomineralylassustanciasjabonosaspueden...
  • Página 5 All manuals and user guides at all-guides.com PRE-INSTALLATION INFORMATION - PRÉALABLES - PRELIMINARES Before installation and setting to work Attention! The feeding pipes have to be rinsed thoroughly before the installation of the mixer, so that no shavings, welding or hemp residual or other dirt can be found in the pipes. Foreign bodies can enter the mixer through the rinsed pipes or the general water plant and could damage the washers/ring washers.
  • Página 6 All manuals and user guides at all-guides.com PRE-INSTALLATION INFORMATION - PRÉALABLES - PRELIMINARES Package content: 1-Built-inbody 2-Wallgasket Contenu de l’emballage: 1-Corpsencastrement 2-Gainemurale Contenido del embalaje: 1-Cuerpoporempotrar 2-Juntadepared...
  • Página 7 All manuals and user guides at all-guides.com PRE-INSTALLATION INFORMATION - PRÉALABLES - PRELIMINARES - Installation tools - Outils nécessaires pour l’installation - Herramienta necesaria para la instalación...
  • Página 8 All manuals and user guides at all-guides.com INSTALLATION - INSTALLATION - INSTALACIÓN Fig. 1 Fig. 2...
  • Página 9 All manuals and user guides at all-guides.com INSTALLATION - INSTALLATION - INSTALACIÓN Built-in body installation Before starting make sure the water network is off. Fig. 1 - To create the proper seat for the built-in body check the actual overall sizes and consider the minimum and maximum built-in depths shown on the plastic protection pre-installed on the body.
  • Página 10 All manuals and user guides at all-guides.com INSTALLATION - INSTALLATION - INSTALACIÓN Fig. 3 Fig. 4 1/2” NPT -m Cold 1/2” NPT -m 1/2” NPT -m Fig. 5 Fig. 6...
  • Página 11 All manuals and user guides at all-guides.com INSTALLATION - INSTALLATION - INSTALACIÓN Built-in body installation (continues...) Fig. 3 - Position the pipes of the water network using the specific connections. Fig. 4 - Insert the body in the slot previously obtained in the wall. Fig.
  • Página 12 All manuals and user guides at all-guides.com INSTALLATION - INSTALLATION - INSTALACIÓN Fig. 7 Fig. 8 Fig. 9 Fig. 10 Open Exit Cold Use hemp or teflon Employer chanvre ou teflon Usarcáñamooteflón...
  • Página 13 All manuals and user guides at all-guides.com INSTALLATION - INSTALLATION - INSTALACIÓN Built-in body installation (continues...) Fig. 7-8 - Stabilize the body inside the wall identifying with the help of a spirit level, the proper positioning. Fig. 9 - Connectthesupplypipestothebodyfollowingtheindicationsinthefigure.Werecommendusing hemp to guarantee tightness on the threads.
  • Página 14 All manuals and user guides at all-guides.com INSTALLATION - INSTALLATION - INSTALACIÓN Fig. 11 Fig. 12 Fig. 13...
  • Página 15 All manuals and user guides at all-guides.com INSTALLATION - INSTALLATION - INSTALACIÓN Built-in body installation (continues...) Fig. 11-12 - Pressurize the outlet pipes connected to the body and check that in the connection point there are no leakages. Fig. 13 - If no problems arise at the stage of system test, close the supply network and carry out the installation.
  • Página 16 All manuals and user guides at all-guides.com INSTALLATION - INSTALLATION - INSTALACIÓN Fig. 14 Fig. 15 Fig. 16 Fig. 17...
  • Página 17 All manuals and user guides at all-guides.com INSTALLATION - INSTALLATION - INSTALACIÓN Fig. 18 Fig. 19 Built-in body installation (continued...) Fig. 14 - Embed completely the built-in in the wall sticking as much as possible to its plastic protection. Fig. 15 - Applygluefortilesonthewall(notprovided). Fig.
  • Página 18 All manuals and user guides at all-guides.com INSTALLATION - INSTALLATION - INSTALACIÓN Instalación cuerpo por empotrar (continúa...) Fig. 14 - Empotren completamente el cuerpo adhiriendo, lo más posible, a la protección de plástico del mismo. Fig. 15 - Apliquenenlaparedcolaparabaldosas(noincluidaenelsuministro). Fig. 16 - Posicionenlajuntadeparedincluidaenelsuministroenelcuerpoempotradoparaqueadhiera completamente a la pared sobre la cual se ha aplicado anteriormente el ligante.
  • Página 19 All manuals and user guides at all-guides.com...
  • Página 20 All manuals and user guides at all-guides.com ET41861-R1...