Final Assembly; Testing And Adjustments - Heath Zenith 4270 Instrucciones De Instalación Y Operación

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

FINAL ASSEMBLY

1. Push the wires into the junction box. Make
sure none of the wires get pinched.
2. Slide the fixture assembly onto the mounting
screws. Tighten decorative nuts removed in step
1 of Installation section securely against fixture
base.
Decorative Nut
3. Install one medium base light bulb (100 Watt
maximum). See Bulb Replacement section for
bulb installation.
4. Caulk around fixture base with silicone weather
sealant.
205072-02

TESTING AND ADJUSTMENTS

1. Turn on the circuit breaker and light
switch.
Note: Sensor has a 1
before it will detect motion. When first turned
on wait 1
2. Set:
• ON-TIME switch to TEST
• DualBrite® switch to OFF
Junction
• SENSITIVITY dial to Midway
Box
TEST 1 5 10
MINUTE
3. Walk through the coverage area noting where
you are when the lights turn on. In TEST mode,
Mounting
light will stay on for 5 seconds after sensing
Screw
motion and then turn off.
5
/
minute warm up period
1
2
/
minutes.
1
2
+
SEN
OFF
3
6 DUSK
HOUR
TO
DAWN
Tabla de contenido
loading

Este manual también es adecuado para:

4271

Tabla de contenido