5. ELECTRICAL CONNECTION

Before any operation, disconnect
power at the main circuit breaker
and
ensure
that
unintentionally turn it on again.
The
electrical
connection
completed according to the diagram
shown opposite:
Plan for:
-
An all-pole switch with a contact
opening distance of at least 3 mm
-
An independent MC (motor control)
delay fuse 1A on the General
Distribution
Panel
Safety.
Use cable of 0,75 mm
To access the terminal block of each fan
unit, open the electrical hatch using a
screwdriver (4 mm) as shown opposite:
La conexión eléctrica debe realizarse
siguiendo el esquema indicado al dorso:

6. START UP

Before starting the equipment after installation, ensure that both fans turn freely and that there is no foreign
body (such as pieces of insulation, etc.) that may block the rotation of the turbine.
Check that the ducts were not crushed during installation: crushed ducting dramatically reduces ventilation
rates and performance.
Ensure the condensate drain is connected properly and that the pipe is insulated to prevent freezing.

7. MAINTENANCE

7.1 Instructions

7.1.1

Extraction and air output nozzles

Clean the bathroom and kitchen exhaust vents with warm water and soap.
Remove dust from the air output vents in the main rooms.
ENGLISH
no
one
can
must
be
for
Electrical
2
section.
Alimentation MONO 230V
50Hz + Ground
Switch
n
18 / 39
NT_51895701_AKOR ST-STGD-AN_130311.docx
Blowing fan
Exhaust fan
o