Connect the appliance to the solar pan-
els according to table 1, which states the
lengths and sizes of the wires used for con-
necting the appliances.
Standard supplied cable size and length will
²
be 6mm
and 20m.
The thick doublet wire (Blue & red) from
the solar panel must be inserted into the
compressor compartment via the hole on
the back – See fig. 4 A & B
The Red Wire (+) (the opposite side of the
terminal is also red) and the Blue wire (-)
(the opposite side of the terminal is black)
has to be connected to the terminal. –
Clean the appliance thoroughly before start
up.
Start up
Before the appliance is loaded with vaccine,
the ice pack ballast must be frozen. The
cool-down time in an ambient temperature
of 43°C will be approx. 5-7 days.
When the temperature on the display of
the thermometer is approx. +4°C in the
morning, the appliance is ready for load-
ing vaccine. Check the temperature in the
basket. The temperature must be between
+2°C and +8°C.
The vaccines must be placed and arranged
as shown. See page 8, fig. 6.
The temperature in the vaccine compart-
ment must always be monitored on the ther-
mometer and be between +2°C and +8°C.
The controller is factory set and should not
be adjusted by unauthorized personnel.
All manuals and user guides at all-guides.com
7
Size:
Cross section
AWG
[mm2]
[Gauge]
2,5
12
4
12
6
10
10
8
Table 1
GB
Max. length:
[m]
[ft]
8
26
13
42
20
65
32
105
A
Blue wire