Installation Procedures
3. Floor Type Installation
j Fix four rubber feet to the bottom of the unit with Ø4X16 bolts
and Ø12 spacers (applicable to floor type units only.
k According to the figure on the right, choose a certain direction to
lead out the drain pipe. Drain holes are available on both right and left
side, practical conditions should be considered. After deciding upon
the direction to lead out the pipelines, wires and drain pipes, drill the
wall holes as per the required drilling
procedure.
Left Side
Drain Hole
Figure 3 Model 40VC009~024F-7G-QEE
Install wall mount rack according to figure below.
l
Model 40VC009~024F-7G-QEE
m Installing Drain Pipe
In the case of model 009-024, fix the drain pipes to drain holes on the left and right side (as shown in figure 3).
Install as follows (see figure below):
Plug the drain pipe to the water pan, as shown by the figure, then, bind the two tight together and tie up the junction area
with heat insulant.
Right Side
Drain Hole
Water Pan
Drain Pipe
Ceiling Mount Rack
Edge
Water Pan
Bond
Drain Pipe
10
Downwards
Heat Insulant
Backwards