Plaster
Guard
2-7/16"
(62 mm)
3-3/4"
(95 mm)
1. Prepare the Site
Provide a 2-7/8" (73 mm) to 3-1/8" (79 mm) diameter hole in the
wall material for the plaster guard.
2. For All Installations
Route the 3/4" mixed water supply line to the transfer valve
location.
Apply thread sealant to the inlet port threads and connect the
water supply to the transfer valve inlet.
If two accessories will be attached to this valve, go to the
"Two-Way Valve Installation" section.
If three accessories will be attached to this valve, go to the
"Three-Way Valve Installation" section.
Kohler Co.
Max
Finished
Wall
Min
Mixed Water
Finished
Supply 3/4"
Wall
Copper Tubing
or Piping
3
1205549-2-B