Yardistry YM11560 Manual De Instalación página 7

Step 3- Assemble Side Walls
1. R emove the upper metal connectors on both sides of PX2 - Two High X Panel. Reattach the metal connectors
to PX2 by securing the bottom two holes of the metal connectors to the top two holes on PX2 so that the metal
connectors stick out from the top. Slide Px1 – One High X Topper between the two protruding metal connectors
on the top of PX2. Attach the metal connectors to Px1. (Fig. 1A) *Ensure Panels are oriented correctly! (Fig.
1B)
2. Secure panels with a S4 - 2 1/4" Wood
Screw the location indicated by the large
arrow in the direction of the arrow.
3. Repeat until four panel assemblies are
created.
Fig. 1B - Filler Strips on Bottom
x4
4x
One High X Topper
PX1
4x
Two High X Panel
PX2
Pilot holes to the right
of Panel!
Note orientation of keyhole.
Tenga en cuenta la orientación
del agujero de la cerradura.
Notez l'orientation de l'encoche
en trou deserrure.
4x
#8- 2 1/4" Wood Screws
S4
7
PX1
Fig. 1A
Do not remove Small Connec
PX2
No retire los conectores
Ne retirez pas les petites pièce
raccordement.
loading