Step 8- Assemble Roof
Project A
Proyecto A
A
Y50113-029
1. A ttach two A- 2 x 4 x 80" Beams to Post Top Connectors with WH-7/16" Hex Bolt as shown in Fig. 1 and 1A.
(2) 2 x 4 x 80"
2. C entre two B-2 x 4 x 41 1/8" Beams in place and attach to Post Top Connectors with WH-7/16" Hex Bolt as
B
Y50113-031
shown in Fig. 1 and 1A. Drill 1/4" Holes for bolts using holes in Post Top Connector as guides.
(2) 2 x 4 x 41⅛"
3. Attach eight BE- 2 x 4 Beam Ends to Post Top Connectors with WH-7/16" Hex Bolt as shown in Fig. 1 and 1A.
C
4. E venly space apart and secure six C-5/4 x 3 x 54¼" Trellis to Beams using 5/4 x 3" Brackets and S1- #10- 1"
Y50113-030
Pan Screws as shown in figures 1 and 2.
(6) 5/4 x 3 x 54¼"
C
A
BE
B
39½"
(1.00m)
BE
Fig. 1A
Not Included/Sold Separately: (4) 4 x 4 Posts, (4) 4 x 4 Post Top Connectors, (8) 2 x 4 Beam Ends
36x
#10- 1" Pan Screw
S1
No se incluye/se vende por separado: (4) postes de 4 x 4, (4) conectores superiores de postes de 4 x 4,
(8) extremos de viga de 2 x 4.
12x -5/4 x 3" Bracket
Non inclus/ A vent séparément: (4) Poteau 4 x 4 po, (4) Attaché a Poteau 4 x 4 po, (8) Poteau d'extrémité
2 x 4 po.
32x
7/16" Hex Bolt w/ Nut
WH
Projet A
Fig. 1
A
BE
Drill 1/4" holes for bolts using holes in Post
A
Top Connector as guides
Taladre agujeros de 1/4" para los pernos
usando los agujeros delconector superior
Drill 1/4" Holes for bolts using
de poste comoguía
holes in Post Top Connector as
B
Percez des trous de 1/4 po (6,35 mm)
guides.
pour les boulons en utilisant les trous des
connecteurs de bout de poteau comme
guides
2x
2 x 4 x 80" Beam
A
2x
2 x 4 x 41 1/8" Beam
B
8x
2 x 4 Beam Ends
Z
S1
(36) #10 x 1"
BE
78½"
(1.99m)
5/4 x 3"
6x
5
12
(12) 5/3 x 3"
B
BE
S1
Fig. 2
C
5/4 x 3 x 54 1/4" trellis
C