Installation Procedures
The standard attached accessories of the units of this series refer to the packing; prepare other accessories according
to the requirements of the local installation point of our company.
1. Before installation [before finishing the installation, do not dispose off the parts included and required for the
installation]
•
Determine the route to move the unit to the installation site;
•
Do not tear the package open before moving the unit to the installation site. When unpacking is needed, a soft
material or protector block with ropes can be used to lift the unit to avoid damaging or scraping of the unit.
2. Select the installation site
(1) The installation site should be selected according to the following criterion, which should be approved by users.
•
Ideal air distribution ensured; where there is
•
no blockage in the air passage;
•
where the condensed water can be drained out properly;
•
where the location can structurally bear the weight of the indoor unit;
•
where enough space can be ensured for maintenance.
•
where the lengths of the piping between indoor units and outdoor units are within the allowable range (refer to
Installation of Outdoor Units)
•
where the distance of at least 1m between indoor units, outdoor units, mains supply, connecting wires and
television or radio can be maintained so as to avoid the image disturbance and noises of the above electrical
appliances. (Even if 1m can be ensured, noise might occur if there is strong electric wave.) Additionally,
equipment, television or other valuables can't be put under the unit so as to avoid the condensed water from
the unit from dropping on the above articles, causing damages.
(2) Height of Ceiling: The ceiling should be located at a place, where the central position of air outlet port is less than
3m high above the ground.
(3) Hanger bolts should be used during installation. Check if the location can bear the weight of the unit.
Reinforce it before installation if necessary.
(4) The dimensions for maintenance make sure that it is easy
to dismount the electrical control box, fan, motor, filter.
(location of hanging bolt)
(dimensions of inspection hole on ceiling)
A
B
space needed for installation (unit:mm)
Model
40VD005-01
6S-7S-QEE
40VD018-03
0S-7S-QEE
40VD038-05
checking
4S-7S-QEE
port
6
D
checking
port
barrier
Size
A
B
C
D
(mm)
(mm)
(mm)
(mm)
761
1211
619
7OO
1161
1611
619
7OO
1561
2O11
619
7OO