Installation; Points To Be Paid Attention To When The Relocation Of The Refrigerator; Before You Start The Refrigerator; Electrical Connection - Beko DSE 25006 Manual De Instrucciones

Ocultar thumbs Ver también para DSE 25006:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 233
3

Installation

B
In case the information which are given
in the user manual are not taken into
account, manufacturer will not assume
any liability for this.
Points to be paid attention
to when the relocation of the
refrigerator
1. Your refrigerator should be
unplugged.Before transportation of your
refrigerator, it should be emptied and
cleaned.
2. Before it is re-packaged, shelves,
accessories, crisper, etc. inside your
refrigerator should be fixed with
adhesive tape and secured against
impacts. Package should be bound
with a thick tape or sound ropes and
the transportation rules on the package
should be strictly observed.
3. Original packaging and foam
materials should be kept for future
transportations or moving.
Before you start the
refrigerator,
Check the following before you start to
use your refrigerator:
1. Attach 2 plastic wedges as
illustrated below. Plastic wedges are
intended to keep the distance which will
ensure the air circulation between your
refrigerator and the wall. (The picture is
drawn up as a representation and it is
not identical with your product.)
2. Clean the interior of the
refrigerator as recommended in the
"Maintenance and cleaning" section.
3. Connect the plug of the
refrigerator to the wall socket. When
the fridge door is opened, fridge
internal lamp will turn on.
4. When the compressor starts to
operate, a sound will be heard. The
liquid and gases sealed within the
refrigeration system may also give rise
to noise, even if the compressor is not
running and this is quite normal.
5. Front edges of the refrigerator
may feel warm. This is normal. These
areas are designed to be warm to
avoid condensation.

Electrical connection

Connect your product to a grounded
socket which is being protected by a
fuse with the appropriate capacity.
Important:
The connection must be in compliance
with national regulations.
• The power plug must be easily
accessible after installation.
12
EN
Tabla de contenido
loading

Este manual también es adecuado para:

Dse 25016Dse 25026Dse 25036Dse 25020Dse 25006sDse 25006m

Tabla de contenido