Preliminary checks
Check the inlet line is connected and sealed.
Check the filter is clean.
Check all the seizure valves on the inlet line are open and the water normally flows to the
pump. Do not run the pump dry.
Check that all discharge pipes are connected to use
The coupling allowances between the pump shaft and the driving (semi-coupling misalign-
ment, cardan inclinations, shaft-pulley gap, belts strain, etc.) remain into the limitations
foreseen by the driving manufacturer.
Replace the oil plug without vent (red colour) by the oil plug with vent. This operation could
have already been carried out by the producer of the machine incorporating the pump.
With pump at a standstill, check that the oil level corresponds to the middle of the oil level
light. The oil level can be also checked by unscrewing the plug with vent: the correct level
must be included between the two notches on the rod. Remember that the oil level must
be always checked with pump at a standstill and completely cooled down.
Before starting the pump, carefully read the instruction of this manual and the instructions
of the machine incorporating the pump.
Make sure that the pump moving parts are suitable protected and that they cannot be ac-
cessed by unauthorised personnel.
In case of use at very low temperature, make sure that there is no ice inside the pump.
Check the cleaning of suction filter.
Make the preliminary operations prescribed by the producer of the machine incorporating
the pump.
CAUTION
 The pump cannot be commissioned if the machine that incorporates it does not
conform to the safety norms established by European Directives. This conformity
is guaranteed by the presence of the CE marking and by the Declaration of Con-
formity of the Producer of the machine incorporating the pump.
 Don't use the pump in case:
-
it has undergone strong hurts;
-
there are oil leaks;
there are visible water leaks.
-
In these cases have the pump be checked by an Engineer.
 Have an Engineer to make the checks expected by the extraordinary maintenance.

7- SETTING UP