Hach NA5600 sc Na+ Instalación página 10

Ocultar thumbs Ver también para NA5600 sc Na+:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 79
Figure 2 Product overview—internal view
1 Latch to open analytics panel
2 Analytics panel (open)
3 Power switch
Figure 3 Door removal
3
The optional cationic pump is necessary for accurate measurements if the sample(s) plumbed to
the analyzer is less than pH 6.
10 English
4 KCl electrolyte reservoir
5 Conditioning solution bottle
6 Optional cationic pump
3
Tabla de contenido
loading

Tabla de contenido