Samsung SNC-C7478 Manual Del Usuario página 13

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

4. Plug the connector of cable from network box
into properly.
5. After checking the orientation of one touch
connector in the upper housing, press the PTZ
mechanism into hook in the upper housing.
6. To lock the PTZ mechanism to the upper
housing, press the two black handles till it sounds
snap.
Installation
7. Close the dome cover. Care must be taken to
locate dome cover by matching the "Arrow"
mark.
8. Tighten four screws on the dome cover in
sequence as shown in the picture bellow.
1
 To maintain the best sealing, the torque of each
screw must be in the range between 0.5 ~ 1.0 N·m
(0.37 ~ 0.73 lbf·ft).
4
2
3
English – 1

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Snc-c7478p

Tabla de contenido