Regalo 1255 B Manual De Instrucciones página 4

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Gate Assembly (continued)
STEP 4
Place the second gate panel with the receiver adjustment knob
in front of the hanging main gate panel. Slide the main gate
panel to the left so that the receiver adjustment knobs are
approximately 1/4" from the wall.
Receiver Placement
STEP 1
With the gate in closed position (creating a
90° angle to the wall the hinges are on)
place the receiver adjustment knob in the
latch assembly wall mount (D). Mark the
location of the holes, making sure you are
located on top of a stud. Do this for the
upper and lower receiver.
(CORRECT ALIGNMENT)
(INCORRECT ALIGNMENT)
STEP 2
Open the gate (swing it away from the
stairs). Mount the upper and lower
receivers using the 2" wood screw.
STEP 5
COUPLER FEMALE
COUPLER MALE
In the center of the two panels place the coupler male (J), and coupler
female (K). The coupler male goes on the inside of the gate. Put one
at the top of the gate and another at the bottom. Place them between
the vertical bars and slide them to the top and bottom. Next take the
coupler female and place them over the horizontal top and bottom bar
and snap it together with the coupler male.
Final Adjustments
STEP 1
2 1/2"
MAX
When the gate is in the closed and latched position
there should be no larger than a 2 1/2" gap from the
wall to the first picket on either side. To achieve this
either screw inward or outward the hinge adjustment
knobs and/or the receiver adjuster knobs.
2 1/2"
MAX
2 1/2" MAX
Tabla de contenido
loading

Este manual también es adecuado para:

1255 w

Tabla de contenido