Monitoring Devices
close as possible to the extraction location, ideally even firmly connected to the extraction
element.
It is recommended to evaluate the volume flow monitoring separately via a PLC or other
suitable control or signalling device assigned to the process. Alternatively, the TBH signal
module can also be used to evaluate and signal the volume flow monitoring.
87