ENGLISH
mode and at the lowest speed.
3. BEFORE USE
Take the product out of the box.
Remove all packaging materials. Keep the original box.
Make sure all the components are included and in good conditions, otherwise, contact
immediately the official Technical Support Service of Cecotec.
4. PRODUCT ASSEMBLY
Before using the device, keep it upright for at least two hours.
The device can be moved easily through the room. Make sure that it is in an upright position
when being moved and should be placed on a flat surface. Do not install the device in a
bathroom or any other humid environment.
Installation of the heating pipe (as shown in Fig. 6)
Fig. 6
Take out the air outlet tube and the air-outlet nozzle from the box and assemble them. Then,
install it in the air vent.
Installation of window sealing accessories
Open the window halfway through and install the window sealing plate (as shown in fig. 7 and
8). Pieces can be placed in an horizontal or vertical position.
Adjust the opening distance of the window sealing accessories' pieces so they are in touch with
the window frame. Fix the pieces of the assembly.
Warning: The flat end of the air-outlet nozzle joints must be in place. The pipe must be
perfectly stretched and have no substantial turning (greater tan 45 º). Keep the air-outlet
nozzle unblocked.
Fig. 7 and 8.
Move the device closer to the window. The distance between the device and the walls or
windows should be at least 50 cm (as shown in fig. 9).
Warning: The length of the hot-air outlet tube should be between 280 and 1500 mm. Do not
replace the tube nor use extension tubes because this may cause a malfunction. The tube must
not be blocked, as this may cause overheating.
Figure 10 and 11.
Note: the window sealing accessories are only fit for sliding windows.
24
FORCE CLIMA 12750 COLD&WARM CONNECTED / FORCE CLIMA 14750 COLD&WARM CONNECTED