FIX THE TANK TO THE GROUND BEFORE USE
Use screws TE M8 with respective fixture, use
specific washers for soft materials ISO 7093
Leave a free space of at least 60 cm around and above the station for installation and maintenance.

5.2 Placing the tank outside the building

If the tank would not buried, to prevent damage to itself and to the seals, you should not expose it to heat sources such as direct
sunlight can be at certain times of the year.
Do not position the lifting station directly on the ground. The site chosen must not have ground water and must not
be subject to flooding. Suitable anchor the station so as to avoid rotation and floating. For this you can use the slots
on the base of the tank.
There must be a horizontal base suitable to bear the weight of the station during its operation. Depending on the
characteristics of the terrain it may be necessary to create walls with bricks, prefabricated components or concrete.
Fill the space between the ditch and the station with sand and compact it suitably. Protect the station suitably
against frost.
Do not drive vehicles over the cover (see fig. 1).
You can close the ditch with a cover (manhole) or other means for facilitating subsequent maintenance. Put up suitable signals
indicating the presence of the station so as to avoid possible damage caused unintentionally. Ensure that there is sufficient space
for installation and maintenance around and above the lifting station.
Position any capacitor holder and/or electric control panel in a place sheltered from the elements.
After having completed the hydraulic and electric connection, it is recommended to place clean sand around the container to reduce
any movements caused by the system and/or by the surrounding terrain.

5.3 Making holes for the collection, delivery and ventilation pipes

Choose the inlet duct already prepared for the inlet pipe so that the arrival of the liquid does not disturb the operation of the pump
float.
The Fekabox 110 tanks have multiple inlets, all marked with the symbol:
Make a hole in the tank in the determined areas, indicated by the symbols shown above.
To make the hole use a hollow cutter as shown in figure 5 (indicative figure).
Fig. 5

5.4 Gluing the collection and ventilation pipes

Before gluing the PVC pipe must be deburred and cleaned with a suitable solvent on the whole surface that will be in contact with the
tank.
To ensure that it sticks firmly, the glue must be applied on the whole newly deburred surface, at least for a complete round.
Attention: Use glue suitable for sticking PVC materials with PE. Also check the drying times indicated in the specific
instructions for the glue used.
For the discharge pipe 2"PP (Fekabox 110) use the multifibre nylon sealant Loctite 55, the polymerising GEI sealant Loctite 5331 or
Teflon. For the steel pipe znb 2" and the other inlet connections use the most suitable glue in accordance with the standards of the
local market.
Inlet
Tank model
diameter
DN50
Fekabox 110
DN110
ENGLISH
Ventilation
diameter
DN50
-
22
Emergency
Cutter
diameter
diameter
DN 44
DN 40
DN100
Fig. 4
Tabla de contenido
loading

Tabla de contenido