Preparing For Installation - GE UVB30 Serie Manual Del Propietário

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

PREPARING FOR INSTALLATION

• Unpack the cooktop and read the Installation
Instructions to understand the required countertop
cutout dimensions and location in the countertop, the
cooktop spacing to the front edge of the countertop,
and the required clearances to the cabinets and walls.
The vent system required cutout width is shown on
page 4. Confirm there is enough side to side counter
space to meet the required spacing and clearances for
the cooktop.
• Using the illustrations below and taking measurements
of the cooktop to establish dimension A, confirm there
is enough front to back counter space (dimension B)
to fit both the cooktop and the vent system. Note the
cooktop rear edge will overlap the vent system front
surface (refer to Page 5).
Screw head
Front of cutout
in countertop
12
Installation Preparation
Front
edge
of
cooktop
C
Dimension C is defined in cooktop Installation Instruction
Front edge
Front of cutout
of countertop
in countertop
Cooktop
4-1/2" Max
Side View: Installed Vent
• Refer to the Creative Solutions section on page 8 if
more counter space is needed.
• Using the illustrations on pages 5 through 7 and taking
measurements of the vent system and its exhaust vent
location, confirm the clearances needed within the
cabinet, the exhaust vent direction, and the alignment
of the exhaust vent with the ducting. If needed for
clearance or duct hookup alignment, reposition the
location of the cooktop, or modify the cabinetry, or
modify the ducting. A remote blower kit JXR867 is
available to move the blower assembly out of the
cabinet area.
• Confirm the electrical receptacles and gas lines are
correctly located, and relocate if needed.
B
B is the minimum dimension of the
flat portion of countertop that is needed
COOKTOP
A
A is the dimension from the screw head on the front surface of
the cooktop base to the rear edge of the cooktop. If you cannot find dimension A
in the cooktop installations instructions, then you must measure it.
Depth of cutout is A + 2 1/8"
Minimum counter depth B = A + C + 2.5"
Cooktop
5-1/2"
Max
Front View: Installed Vent
Back edge
of cooktop
1/8" minimum
5-1/2"
Max
D
o
w
n
d
3/8"
r
minimum
a
f
t
V
e
n
t
2 1/8"
Back of cut
in countertop
49-80777
Tabla de contenido
loading

Este manual también es adecuado para:

Uvb36 serieUvb36dkbbUvb36skssUvb30skssUvb30Uvb36

Tabla de contenido