Barrette 34111487 Manual De Instrucciones página 3

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

1.
a. Apply provided vinyl cement to all inside
surfaces of the uprights where the rails will be
installed (Fig. 1).
b. Insert bottom rails into upright routes (Fig. 2).
NOTE:
• For 3-Rail and 4-Rail gates, top and
• Some Post & Rail gates will have
2.
Install top rail into both upright routes (Fig. 5).
bottom rail are same size, middle
rails are longer.
middle rails. Insert the middle rails into
both upright routes at this time (Fig. 3 & 4).
Middle rail will install flush against
the upright.
Fig. 1
Fig. 2
Rail
Route
Fig. 3
Gate
Upright
Middle Rail
Bottom Rail
Fig. 4
Gate
Upright
Middle Rails
Bottom Rail
Fig. 5
3
Tabla de contenido
loading

Tabla de contenido