Large Tube Nut
Coupling Nut
Escutcheon
Fiber Washer
Rubber Seal
2. Install the Vacuum Breaker and Valve
NOTE: Insert the components in the order specified.
Place the vacuum breaker into the tailpiece.
Place the fiber washer onto the vacuum breaker.
Slide the large tube nut over the bottom of the tailpiece and
tighten it to the valve body with the strap wrench.
Slide the coupling nut, escutcheon, fiber washer, and rubber seal
over the end of the tailpiece.
Assemble the valve body to the control stop by hand tightening
the inlet arm nut. Align the tailpiece with the toilet's spud.
Slide the escutcheon over the spud.
Hand tighten the coupling nut to the spud.
Plumb and tighten the valve to the control stop, and the coupling
nut to the spud using a strap wrench.
Remove the tape covering the sensor eyes.
Turn on the water supply.
3. Verify Valve Function
NOTE: The valve is programmed with a 24-hour cleaning flush
feature.
Approach the fixture and stand in front of the sensor.
1104277-2-A
Valve Body
Inlet Arm Nut
Fiber
Washer
Vacuum
Breaker
Tailpiece
6
Control
Stop
Kohler Co.