Partial Recess Installation - 2X4 Framing - Dimplex BLF5051 Manual Del Usuario

Ocultar thumbs Ver también para BLF5051:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Fireplace Installation
the screws and hang the fireplace
on the wall. Screw heads and
washers will fit through the
keyholes and the fireplace will
slide down into position (screws
will slide into the narrow part of
the keyholes).
10. Tighten all 4 mounting screws
down on the fireplace chassis.
CAUTION: Ensure at least 2 of
the mounting screws are inserted
in wall studs.
11. Carefully replace and install the
partially reflective glass and the
glass brackets using the screws
removed in step 1.
12. Refer to Front Glass Installation
section for final installation
procedures.
Figure 10
2 x 4 Framing
Partial Recess Installation
- 2x4 Framing
CAUTION: Two people may be
required for various steps of this
procedure.
1. Prepare a wall with a framed
opening of 46 ½ in. (118.1 cm)
wide x 16 ½ in. (42 cm) high
(Figure 10).
!
NOTE: The sizing has allowed
for 1/4 in. (6.4 mm) around
the fireplace insert for ease of
installation. This fireplace does not
require any additional venting.
2. Choose your method of supplying
power to the unit:
• Plug-in (you may run the power
cord out of the framed wall
opening to an existing outlet or
install an outlet on a nearby wall
stud within the wall).
• Hardwire the fireplace - follow the
hardwiring instructions on page 9.
3. Lift the fireplace and insert it into
the opening (Figure 11).
4. Use the supplied bubble level
to level the fireplace within the
framing. Adjust as required.
5. Drive four supplied mounting
screws through the four mounting
holes located in each corner of the
fireplace chassis, into wall studs.
(Figure 11)
13
Tabla de contenido
loading

Tabla de contenido