Pump Installation - Simer 3515C Manual Del Usuario

Bombas centrífugas de rociadores de césped de hierro fundido
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Installation
Figure 8 – Bolt Pump Down
3023 0997
40
60
20
80
10 0
Figure 9 – Independently Support All
Piping Attached to Pump
3024 0997
Use Teflon Tape Or Pipe Joint
Compound Approved For Use On PVC.
No Air Leaks In
Suction Pipe.
If Air Flows
Water Won't
Use Teflon Tape.
Figure 10 – Use Teflon™ tape on pipe
joints and connections to pump
Don't
Don't Hit
Overtighten
Thread Stops
From
Pump
Body
Well
Hand Tight Plus 1-1/2 Turns With Wrench.
748 0993
Figure 11 – Don't overtighten
For parts or assistance, call Simer Customer Service at 1-800-468-7867

Pump Installation

1. Bolt pump to solid, level foundation.
2. Support all piping connected to the pump.
3. Wrap 1-1/2 to two layers of Teflon™ tape clockwise (as you face end of
pipe) on all male threads being attached to pump.
4. Tighten joints hand tight plus 1-1/2 turns. Do not overtighten.
NOTICE: Install pump as close to well head as possible. Long piping runs
and many fittings create friction and reduce flow.
NOTICE: For long horizontal pipe runs, install a priming tee between check
valve and well head as shown in Figure 5. For driven point installations,
install a check valve as shown in Figure 6. Be sure check valve flow arrow
points toward pump.
Use schedule 80 or iron pipe. See Installation for more information.
1
Use only
Teflon™ tape or Teflon™ based joint compounds for
making all threaded connections to the pump itself. Make sure
that all pipe joints in the suction pipe are air tight as well as
water tight. If the suction pipe can suck air, the pump will not
be able to pull water from the well.
1
E. I. DuPont de Demours and Company Corporation, Delaware
Sealing Pipe Joints
6
Tabla de contenido

Solución de problemas

loading

Tabla de contenido