Box Contents - Cisco Systems Power System 2300 Guía De Instalación De Hardware

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Preparing for Installation

Box Contents

Cisco Redundant Power System 2300 Hardware Installation Guide
2-8
When installing the RPS 2300 is a rack with a switch stack, install the
RPS 2300 at the bottom of the rack. If needed, allow one RU space between
the RPS 2300 and the first switch above to provide room for cabling. Connect
the RPS cable to the switch before connecting any StackWise cables.
For information about installing the RPS with the switch see the Catalyst
3750-E and Catalyst 3560-E Hardware Installation Guide.
Make sure that any power supply module or fan module is securely fastened
in the RPS 2300 front panel.
Carefully remove the contents from the shipping container, and check each item
for damage. If any item is missing or damaged, contact your Cisco representative
or reseller for support. Return all packing material to the shipping container, and
save it.
The box is shipped with these items:
The RPS 2300 (PWR-RPS2300) with one of these configurations:
One or two 750-W power supply modules (C3K-PWR-750WAC)
One or two 1150-W power supply modules (C3K-PWR-1150WAC)
One spare power supply insert (BLNK-RPS2300=).
If you ordered only one power-supply module, a spare power supply
insert ships with the RPS 2300. If you ordered two power-supply
modules, you can order the power supply insert as a spare part.
One of these RPS 2300 connector cables:
CAB-RPS-2300-E= (22-pin-to-22-pin cable for use with Catalyst
3750-E and 3560-E switches)
CAB-RPS-2300= (14-pin-to-22-pin RPS cable for use with other supported
network devices)
One country-based power cable for each power supply
AC power cord retainer
One ring lug
Mounting kit containing:
Chapter 2
RPS 2300 Installation
78-17647-02

Capítulos

Tabla de contenido
loading

Tabla de contenido