Complete The Installation - Kohler K-4918 Guia De Instalacion

Ocultar thumbs Ver también para K-4918:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Install the Urinal (cont.)
NOTE: If adjustment is necessary, make vertical adjustments along
the slots on each wall hanger until the urinal can be tightened to the
collar.
Install permanent screws into the holes on the wall hangers, as
shown on the installation template.
CAUTION: Risk of product damage. Do not overtighten the
bolts.
Carefully position the urinal on the wall hangers, then secure the
urinal to the bracket using the washers and bolts provided.

3. Complete the Installation

Pour 1/2 gallon (1.89 L) of water into the trapway.
Check for leaks. Repair as needed.
Pour 3 ounces (89 ml) of sealing liquid (provided) into the
trapway. The sealing liquid will float on top of the water in the
trapway.
Place the strainer in the drain hole.
Kohler Co.
5
1048745-2-D
Tabla de contenido
loading

Tabla de contenido