Complete The Installation - Kohler K-3546 Guia De Instalacion

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Fill Valve
Nut
Supply Shank
Seal
Washer
Coupling
Nut

4. Complete the Installation

Install the trip lever if one is not already installed. Follow the
instructions packed with the trip lever.
Connect the supply shut-off valve to the toilet supply shank.
Open the supply shut-off valve slowly to check for leaks. If the
connections have been properly assembled, a slight tightening of
the nuts should stop leakage.
Allow approximately one minute to bring the system to its
operating pressure.
Install the toilet seat according to the packed instructions.
Carefully set the cover onto the tank.
Flush and repressurize the toilet three times to stabilize the
system.
Flush the toilet several times and check all connections for leaks.
Periodically check for leaks for several days following the
installation.
1007284-2-D
Compression
Washer
Tubing
Compression
Nut
Ferrule
Supply
Shut-Off
Valve
Supply Shut-Off Valve
Connection
6
Kohler Co.
Tabla de contenido
loading

Tabla de contenido