Overall Dimensions; Electrical Connections - Ecoflam BLU 500.1 PR Manual De Instrucciones

Ocultar thumbs Ver también para BLU 500.1 PR:
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 23
420010298801 BLU 500.1 ÷ 1200.1 PR
EN
MODELS
BLU 500.1 PR
BLU 700.1 PR
BLU 1000.1 PR
BLU 1200.1 PR
All burners factory tested at 400 V 50 Hz three-phase for motors and 230 V 50 Hz monophase with neutral for auxi-
liary equipment. If mains supply is 230 V 50 Hz threephase withuot neutral, change position of connectors on burner
as in fig. Protect burner supply line with safety fuses and any other devices required by safety standards obtaining in the
country in question.
Once connected the burner to the gas pipeline, it is necessary to control that this last is perfectly sealed. Also verify that
the chimney is not obstructed. Open the gas cock and carefully bleed the piping through the pressure gauge connector,
then check the pressure value trough a suitable gauge. Power on the system and adjust the thermostats to the desired
temperature. When thermostats close, the sealing control device runs a seal test of valves; at the end of the test the bur-
ner will be enabled to run the start-up sequence.
Before lighting the burner, make sure that it has been installed correctly. Check the electric wiring against the diagrams
and the piping in the plant. Before making the electrical connection, make sure that the voltage coincides with the data
specified on the nameplate indicating the technical features. The diagram of the electrical connection and the starting
cycle are illustrated separately. To connect the equipment to the burner, refer to the diagram. Pay particular attention to
the connection of the neutral and phase: never switch them around. Check the earthing connection for the plant. For
the three-phase motors, check the motor's sense of rotation (see arrow). Bleed off any air and contaminants in the gas
pipe. Mak sure that the gas pressure is within the range specified on the nameplate. This must be done with a pressure
gauge in the pipe tap on the burner. Start the motor and begin preventilation. The motor reducer brings the air damper
into the fully open position within about 30 seconds. When the motor NdT: air damper is fully open, a signal to the
electronic control equipment triggers a preventilation cyce that lasts about 66 seconds At the end of the preventilation
phase, the motor reducer adjusts the damper to suit a low flame, enabling the the burner to be ignited on minimum
capacity. At the same time, the ignition transformer is powered and, three seconds later (pre-heating), the gas valves are
powered. At this point, the butterfly valve adjusts the gas flow in the combustion head. Two seconds after the valves
have opened, the transformer is cut off from the circuit. If the burner has not been ignited, it cuts out within 2
seconds. The burner is ignited on minimum capacity (about 30% of the maximum capacity). The modulator will open
the servomotor on maximum capacity or will hold it on the intermediate capacity required by the plant. The opening
of the servomotor will open the gas and air flows proportionally so as to always ensure optimal combustion at all capa-

OVERALL DIMENSIONS

E
D - D1
N
A
B
C
D
650
330
320 175
650
330
320 175
650
330
320 175
670
350
320 310

ELECTRICAL CONNECTIONS

CONNECTION TO THE GAS PIPELINE
START UP OF THE BURNER
A
B
C
O
D1
E
F
G
395
555 160
390 600
395
555 170
390 600
395
555 190
390 600
460
555 200
390 600
10
I
M
D = short head D1 = long head
• = ( Optional)
Dimensions (mm)
H1
I
L
M
190
190 M10 140 165
190
190 M10 140 165
190
190 M10 140 165
190
190 M10 140 165
N
O
Tabla de contenido
loading

Este manual también es adecuado para:

Blu 700.1 prBlu 1000.1 prBlu 1200.1 prG20G25G30 ... Mostrar todo

Tabla de contenido