Installing Your Appliance; Building In - Fagor 6IFT-4X Manual De Instalación Y Utilizacion

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

fr et GB de fagor induction I2.qxp
EN

1 1 / INSTALLING YOUR APPLIANCE

BUILD-IN
Your appliance can be easily integrated above
a cabinet, an oven or a build-in-ready house-
hold appliance.
For all types of installation, your induction
hob needs proper ventilation.
ABOVE A CUPBOARD OR DRAWER UNIT
The positioning must allow a fresh air intake
and air outlet.
4 cm mini
ventilation space
ABOVE AN OVEN
The positioning must allow a fresh air intake
and an air outlet of 4 mm minimum
28/02/2006
17:07
Tip
If your oven is located below your
hob, the hob's thermal safety measures for-
bid the simultaneous use of the hob and the
pyrolysis program of your oven.
Your hob is equipped with an anti-overhea-
ting safety device.
This safety can be activated, for example,
when the hob is installed over an oven that
is not sufficiently insulated. If this occurs, a
series of small lines appear in the control
panel. In this case, we recommend that you
increase the ventilation of your hob by crea-
ting an opening in the side of your cabinet
(8 cm x 5 cm)
oven insulation kit (reference 75X1652) that
is available from the Post-Sales Service
Department.
Warning
You must ensure that the air intakes
located under your cooking appliance
remain clear at all times.
MINI 4 mm
62
Page 62
and/or that you install the
Tabla de contenido
loading

Tabla de contenido